FREE SHIPPING BioPro 380 Biodiesel Processor, Model# ADBP-380
BioPro Automated Biodiesel Processor is a stainless steel industrial-grade processor that converts organic oils into an alternative fuel biodiesel through acid/base catalyzed chemical reactions. The oil is altered to allow it to run efficiently in an unmodified diesel engine. The BioPro 380 is designed for self-contained operation, with very little user interaction: no metering or mixing chemicals. Simply add the required ingredients, press the Big Green Button and walk away. The oil can be any organic oil (tallow, fats, vegetable oil, etc.), but in most cases, waste vegetable oil is commonly used to make biodiesel due to its wide availability. U.S.A. Capacity (gal.): 100 in 48 hours, Oil Type: Waste vegetable oil, Oil Reservoir (gal.): 100, Methanol (gal.): 20, Catalyst/Chemicals: 6.7lbs NaOH or 10.4lbs KOH, 308mL Sulfuric acid, Water Reservoir (gal.): 90, Power Requirements: 115v or 230v plug, Wash Method: 2 stage water wash, Operation: Automated control with manual overrides, Pump: Fuel pump included Construction: Welded 304 stainless steel body; powder-coated carbon steel covers Fittings: 304 stainless steel or glass-filled polypropylene Controls: AUTO mode controlled by program logic controller; Start button initiates completely automated process; Manual mode controlled by switch actuation BioPro 380 capacity: 100 gallons of oil yields 100 gallons of fuel Electrical: 110V AC/ 15 Amp & 220V AC 30 Amp circuit Wash method: Three-stage water wash spray wash followed by two turbulent washes Automatic removal of waste water Footprint dimensions: 64in.W x 34in.D x 80in.H Minimum Requirements: 50, 75 or 100 gallons of new or used vegetable oil, depending on batch size selected 20 gallons of methanol (commonly available as racing fuel for alcohol dragsters) Lye or caustic potash 93% pure or better sulfuric acid (not battery acid) Approximately 100 gallons of fresh water or pressurized source of fresh water, as from a garden hose Total Time: Approximately 48 hours from start to finish Includes rubber gloves, protective goggles, vinyl apron, respirator


